243 Survey Chapter Wise McQ Test of 25 Question #2 Survey Chapter Wise McQ Test of 25 Question for PSC, NEC, UPSC, SSC and Many more. 1 / 25 1. Determining quantities or afford sufficient data for the designing of works such as roads and reservoirs is called A. Topographic surveying B. Engineering surveying C. City surveying D. Cadastral surveying 2 / 25 2. Determining points of strategic importance are called A. Topographic surveying B. City surveying C. Military surveying D. Traverse surveying 3 / 25 3. Determining different strata in the earth’s crust is called A. Mine Survey B. Geological Survey C. Geodetic Survey D. Archaeological Survey 4 / 25 4. Determining unearthing relics of antiquity is called A. Mine Survey B. Geological Survey C. Geodetic Survey D. Archaeological Survey 5 / 25 5. The building line used when setting out the position of the building on site is established by the; A. Architect B. Building surveyor C. Client D. Local authority 6 / 25 6. Which among the following is one of the principles of surveying? A. Taking measurements B. Covering entire area C. Determining the elevation differences D. Working from whole to part 7 / 25 7. The working from whole to the part is done in surveying in order to ensure that A. survey work is completed more quickly B. errors and mistakes of one portion do not affect the remaining portion C. number of errors is minimum D. plotting is done more quickly 8 / 25 8. Chain Survey is suitable in A. Open area B. Plans are required on large scale C. Ground is fairly level D. All of the above 9 / 25 9. Chain Survey is not suitable in A. Undulating areas B. Open area C. Crowded area D. Both a and c 10 / 25 10. What is driven or filled in the soft ground during the marking of survey stations? A. Wooden pegs B. Spikes C. Nails D. Cement mortar 11 / 25 11. Survey stations may be marked on the ground using a? A. Peg B. Pointer C. Rod D. Pole 12 / 25 12. Diameter of ring of arrow is A. 25 mm B. 30 mm C. 35 mm D. 50 mm 13 / 25 13. Pacing is difficult in A. Smooth surfaces B. Plain areas C. Rough ground D. All of the above 14 / 25 14. The chaining on sloping ground is A. easier along the falling gradient B. easier along the up gradient C. equally convenient along falling as well as up gradient D. All the above 15 / 25 15. What is the length of the revenue chain? A. 100ft B. 33ft C. 66ft D. 50ft 16 / 25 16. How many numbers of links in case of revenue chain? A. 10 B. 12 C. 16 D. 33 17 / 25 17. What is the length of each link in case of revenue chain? A. 1 ft B. 2 ft C. 2.0625 ft D. 1.0625ft 18 / 25 18. Metric chains are generally available in A. 10 m and 20 m length B. 15 m and 20 m length C. 20 m and 30 m length D. 25 m and 100 m length 19 / 25 19. A metallic tape is A. A tape made of any metal. B. Another name of a steel tape. C. Another name of an invar tape. D. Is a tape of water proof fabric into which metal wires are woven? 20 / 25 20. Spring balance in linear measurements is used A. To know the weight of the tape B. To apply the desired pull. C. To know the standard pull at the time of measurement. D. None of the above 21 / 25 21. What type of ranging is done if both ends of surveying lines are visible? A. Direct B. Indirect C. Reciprocal D. Unable to do 22 / 25 22. What has resorted to when both the ends of the survey line are not intervisible? A. Direct B. Indirect C. Irreciprocal D. Unable to do 23 / 25 23. For indirect ranging, number of ranging rods required, is A. 1 B. 2 C. 3 D. 4 24 / 25 24. Minimum number of ranging rods required for direct ranging is A. Two B. Three C. Four D. Five 25 / 25 25. Ranging in distance measurements is A. Another name of taping B. A process of establishing intermediate points on a line C. Putting the ranging rod on the hill top for reciprocal ranging D. A process of determining the intersection of two straight lines. Your score is The average score is 66% 0% Restart quiz Exit civil engineermcqmcq civilmock testpscsub engineersurveyupsc