110

Sub-Engineer Mock Test of 50 Past Question #56

Sub-Engineer Collection of 50 Past Question from Loksewa Aayog Mock Test.

1 / 50

1. The compressive strength of concrete M25 under bending compression is

2 / 50

2. In R.C.C., steel is used because it can provide

3 / 50

3. Distribution reinforcement in a simply supported slab is provided to distribute

4 / 50

4. According to thumb rule, the thickness of a slab should be taken at the rate of

5 / 50

5. In a combined footing if shear stress exceeds 5kg / cm²  the nominal stirrups provided are:

6 / 50

6. In a beam section, if the steel reinforcement is of such a magnitude that the permissible stresses in concrete and steel are developed simultaneously, the section is known as

7 / 50

7. The section in which concrete is not fully stressed to its permissible value when stress in steel reaches its maximum value, is called

8 / 50

8. The minimum amount of bottom reinforcement that should be continued over the centre length of the beam in R. C. C. continuous beam is

9 / 50

9. Steel is efficiently used in

10 / 50

10. The total number of grades of concrete mixes as per IS 456 is

11 / 50

11. An expansion joints is provided when the length of a concrete structure exceeds

12 / 50

12. The test conducted by Vicat’s apparatus is for

13 / 50

13. The bulking of aggregate is

14 / 50

14. The capacity of waste water treatment plant located at Guheswori, Kathmandu

15 / 50

15. Sewerage system originates from

16 / 50

16. Per capita water demand is measured as

17 / 50

17. Pathogens in water may cause

18 / 50

18. If the coliform bacteria is present in a sample of water, then the coliform test to be conducted is

19 / 50

19. Water-shed line is abandoned for aligning an irrigation canal if

20 / 50

20. For a given discharge in a channel, Blench curves give the relationship between the loss of head (HL) and

21 / 50

21. Pick up the incorrect statement from the following

22 / 50

22. The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as

23 / 50

23. The walls which are necessary on the hill side of roadway where earth has to be retained from slipping is known as

24 / 50

24. The minimum design speed for hairpin bends in hill roads is taken as

25 / 50

25. Which of the following premix methods is used for base course?

26 / 50

26. Most suitable material for highway embankments is

27 / 50

27. The binder normally used in flexible pavement construction is

28 / 50

28. A muster roll is

29 / 50

29. Slack time in PERT analysis

30 / 50

30. Amount required to be deposited by contractor while submitting tender is

31 / 50

31. Total station is

32 / 50

32. Different grades are jointed together by

33 / 50

33. The angle of intersection of a curve in the angle between

34 / 50

34. The size of plane table is

35 / 50

35. The following sights are take on a ‘turning point”

36 / 50

36. A mortar joint in masonry which is normal to the face of wall is known as

37 / 50

37. The slenderness ratio for masonry walls should not be more than

38 / 50

38. The proportions of lime and sand in the mortar normally used in brick construction are

39 / 50

39. Dado is usually provided in

40 / 50

40. The process of making the back ground rough, before plastering is

41 / 50

41. Black cotton soil is unsuitable for foundations because its

42 / 50

42. The exterior angle between outer faces of a wall, is known as

43 / 50

43. A projecting piece usually provided to support a truss, is

44 / 50

44. Which of the following tests measures the toughness of road aggregates?

45 / 50

45. Reconnaissance is best done with the help of

46 / 50

46. The distance travelled by revolving the wheel of a vehicle more than its circumferential movement, is known as

47 / 50

47. The coefficient of compressibility of soil, is the ratio of

48 / 50

48. The ratio of volume of air voids to the volume of total voids, is known as

49 / 50

49. In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having

50 / 50

50. Time and progress chart of a construction, is also known as

Your score is

The average score is 58%

0%

Exit

Show CommentsClose Comments