Sub-Engineer Mock Test of 50 Past Question #55

Sub-Engineer Collection of 50 Past Question from Loksewa Aayog Mock Test.

1 / 50

1. According to manning’s equation, the maximum discharge in a circular channel of diameter D occurs when the depth of flow is

2 / 50

2. At the horizontal curve the outer edge of the pavement is raised with respect to inner edge to counteract the effect of centrifugal force is known as

3 / 50

3. The initial application of a binder to an absorbent highway surface prior to the construction of a wearing coat is called,

4 / 50

4. The layer of pavement located immediately above the sub grade soil to improve the load supporting capacity is called

5 / 50

5. A documents showing the list of quantity of various items of works required for completion of any project is known as

6 / 50

6. The unit of measurement of the wooden railings in staircase is

7 / 50

7. The value of dismantled material less the cost of dismantling is

8 / 50

8. The bid bond validity for bidding of works contract costing less than NRs.100 million is

9 / 50

9. A type of contract where whole project is divided into smaller distinct activities and bidder quotes separate rates against each work items is called

10 / 50

10. The amount of money deposited by interested bidders a tender as a guarantee is known as

11 / 50

11. The types of format in which the records of labour are kept on daily basis for executing works is

12 / 50

12. In airport the lift off distance is the distance along the centre of the runway between the starting point and

13 / 50

13. Aircraft operation is guided by the

14 / 50

14. The area of the airport to accommodate aircrafts for loading/unloading of cargo and passengers, parking, refueling etc. is called

15 / 50

15. Bowditch Rule is applied to

16 / 50

16. The closed contour with higher value inwards, represents

17 / 50

17. A change point is

18 / 50

18. The survey in which the curvature of the earth is considered is called

19 / 50

19. Compressive strength of ordinary Portland cement is equal to not less than following value after 7 days

20 / 50

20. Initial and final setting time of quick setting cement is equal to

21 / 50

21. Vehicle is a liquid which acts as a binder for various pigments of the paints

22 / 50

22. The chemical classification divides the rocks into

23 / 50

23. A force A of 30N and together force B of unknown magnitude act 90° to each other. They are balanced by a force of 50N. The magnitude of force B is

24 / 50

24. Which of the following gives modulus of elasticity?

25 / 50

25. Moment of inertia of a height h about CG is triangular section with base band

26 / 50

26. Which is correct statement?

27 / 50

27. The flow in open channel is laminar if the Reynold number is

28 / 50

28. For a most economical trapezoidal open channel, the half of the top width must be equal to

29 / 50

29. The velocity distribution circular/pipe is of viscous fluid through a

30 / 50

30. Required water content during compaction of soil corresponding to maximum dry density is called

31 / 50

31. The relationship between coefficient of active earth pressure (Ka) and passive earth pressure (Kp) is

32 / 50

32. A fully saturated soil is called,

33 / 50

33. The maximum density on compaction occurs at a particular water content which is known as

34 / 50

34. Maximum shear stress at m20 concrete is equal to

35 / 50

35. The longitudinal reinforcement provided for RCC column restricted to

36 / 50

36. Minimum thickness of load bearing RCC wall should be

37 / 50

37. Which of the following soil has lowest bearing capacity?

38 / 50

38. The location of a well is considered to be good, if it is suck into

39 / 50

39. Black cotton soil is unsuitable for foundations because its

40 / 50

40. The construction joints in buildings are provided after

41 / 50

41. The main function of a manhole in a sewer line is

42 / 50

42. If the head of water is more than 100m, then the types of pipe used is

43 / 50

43. A water which does not contain harmful impurities and does contain other salts and impurities either good for health or harmful to health is called

44 / 50

44. Maximum velocity all sewer at Nepal is limited to

45 / 50

45. The canal which is not supposed to do any irrigation is called

46 / 50

46. Kor-watering is the irrigation water supplied to a crop

47 / 50

47. If the irrigation efficiency is 80%, conveyance losses are 20% and the actual depth of watering is 16 cm, the depth of water required at the canal outlet, is

48 / 50

48. The time with which direct cost does not reduce with the increase in time is known as

49 / 50

49. If the expected time for completion of a project is 10 days with a standard deviation of 2 days, the expected time of completion of the project with 99.9% probability is

50 / 50

50. The expected out turn for earth work in excavation in ordinary soil per workman per day is