112

Estimating & Costing Chapter Wise McQ Test of 25 Question #4

Estimating & Costing Chapter Wise McQ Test of 25 Question for PSC, NEC, UPSC, SSC and Many more.

1 / 25

1. No. of labors required for 1 m³ PCC work in 1:3:6 cement mortar is

2 / 25

2. No. of unskilled manpower required for 100 m², 20 mm thick plaster in 1:5 cement mortar

3 / 25

3. Thickness of plastering is usually

4 / 25

4. Rate of construction materials, transportation, equipment rate, labor rate etc is prepared by

5 / 25

5. District rate fixation committee prepares the rate of rates of construction materials, transportation, equipment rate, labor rate etc according to

6 / 25

6. Chairman of District rate fixation committee is

7 / 25

7. The main factor to be considered while preparing a detailed estimate, is

8 / 25

8. The main factor to be considered while preparing a detailed estimate, is

9 / 25

9. The main factor to be considered while preparing a detailed estimate, is

10 / 25

10. The rate of an item of work depends on

11 / 25

11. The rate of an item of works depend upon

12 / 25

12. The quantity of work of any item which is the output of a skilled labour in a day is known as

13 / 25

13. The capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as

14 / 25

14. The expected outurn of brick work in cement mortar in foundation and plinth per mason per day is

15 / 25

15. The expected out turn of half brick partition wall per mason per day is

16 / 25

16. The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

17 / 25

17. The expected outurn of 12 mm plastering with cement mortar is

18 / 25

18. The expected out turn of 2.5 cm cement concrete floor per manson per day

19 / 25

19. The expected out turn for earth work in excavation in ordinary soil per mazdoor per day is

20 / 25

20. Volume of sand carried in a truck is approximately

21 / 25

21. Number of bricks that can be carried by 8 tones truck is

22 / 25

22. For 100 square metres of plastered surface, the quantity of lime required for one coat of white washing will be

23 / 25

23. The quantity of lime required for 10 m² white washing (single coat) is

24 / 25

24. Snowcem paint required for 100 m² area as per norms (one coat)

25 / 25

25. For 100 cubic metre of roof surface, the area of A.C. corrugated sheets required will be

Your score is

The average score is 53%

0%

Exit

Show CommentsClose Comments

Leave a comment