76

Water Supply & Sanitation Chapter Wise McQ Test of 25 Question #5

Water Supply & Sanitation Chapter Wise McQ Test of 25 Question for PSC, NEC, UPSC, SSC and Many more.

1 / 25

1. The maximum flow in a public stand post is limited to………….to avoid crowding and long queue at stand post to fetch water.

2 / 25

2. Round trip time for PST

3 / 25

3. The discharge through public stand post

4 / 25

4. The flow from public stand post should not be less than ….

5 / 25

5. The one public stand post is equal to

6 / 25

6. Structure constructed at last of water supply scheme is

7 / 25

7. Which of the following work is last stage water supply project?

8 / 25

8. Ideal residual head for stand post

9 / 25

9. Design period …… population growth

10 / 25

10. Design period of water supply scheme is depending on

11 / 25

11. The minimum design period for in any water supply project

12 / 25

12. The design period of water supply project is taken as ……. Year

13 / 25

13. When population growth rate is less than 2% the design period is taken as

14 / 25

14. Design period is

15 / 25

15. A water supply scheme is usually designed for a period of

16 / 25

16. The year till which water supply scheme is designed to provide service

17 / 25

17. The year from which water supply project provides service to community after completion of construction is known as

18 / 25

18. The base period generally taken as:

19 / 25

19. The per capita per day demand of water is taken as an average value over a period of

20 / 25

20. Per capita demand of water is calculated in liters

21 / 25

21. Per capita demand or rate of demand

22 / 25

22. Demand of water depends on

23 / 25

23. Per capita demand of water is more in case of

24 / 25

24. Per capita demand of water is less in case of

25 / 25

25. The per capita consumption of the locality will be more when

Your score is

The average score is 56%

0%

Exit

Show CommentsClose Comments

Leave a comment