165

Sub-Engineer Mock Test of 50 Past Question #50

Sub-Engineer Collection of 50 Past Question from Loksewa Aayog Mock Test.

1 / 50

1. In direct method of contouring, the process of locating or identifying points lying on a contour is called

2 / 50

2. Revolving of the telescope of a theodolite in a horizontal plane is:

3 / 50

3. Which of the following is generally not used in a plane tabling survey?

4 / 50

4. The method of plane tabling generally adopted to obtain details and plotting inaccessible points is:

5 / 50

5. Reciprocal ranging is adopted when the following is encountered:

6 / 50

6. ………is used for most accurate measurement.

7 / 50

7. An ordinary Portland cement bag weights:

8 / 50

8. Bitumen paint renders:

9 / 50

9. Which of the following has the highest crushing strength?

10 / 50

10. Water required per bag of cement, is

11 / 50

11. A structural with multiple straight and linear members, and all the joints pin joints is a:

12 / 50

12. The shape of a bending moment diagram of a beam carrying a uniformly distributed load is:

13 / 50

13. Centre of gravity of a thin hollow cone lies on the axis of symmetry at a height of:

14 / 50

14. When shear force at a point is zero then bending moment at that point will be:

15 / 50

15. For walls, columns and vertical faces of all structural members, the form work is generally removed after:

16 / 50

16. For exerting a pressure of 4.8kg / c m²  the depth of it specific gravity 0.8, should be:

17 / 50

17. The velocity of the fluid particle at the centre of the pipe section is:

18 / 50

18. Which of the following is a glacial soil:

19 / 50

19. A foundation is called shallow, if its depth, is:

20 / 50

20. Failure of the stability of slope generally occurs along:

21 / 50

21. Cohesive soils:

22 / 50

22. Tensile internal force tends to:

23 / 50

23. The property of fresh concrete, in which the water in the mix tends to rise to surface while placing and compacting is called:

24 / 50

24. M25 grade of concrete approximates:

25 / 50

25. Slump test is concrete is used for:

26 / 50

26. The breaking up of cohesions in a mass of concrete is called:

27 / 50

27. Seasoning of timber is required to remove

28 / 50

28. The most important tool is brick laying for lifting and spreading mortar and for joints is:

29 / 50

29. The overlapping of bricks or stones in masonry is called:

30 / 50

30. It is estimated that the quantity ratio of water supply is Kathmandu by exploring ‘ground water’ to that by utilizing ‘Surface runoff’ water (GW:SW) is:

31 / 50

31. The capacity of flushing cistern for water closets is:

32 / 50

32. Turbidity is mainly due to:

33 / 50

33. The maximum pressure to which cast iron pipes may be subjected to is:

34 / 50

34. Kharif crops are grown is:

35 / 50

35. When Koshi river (Koshi development) is signed:

36 / 50

36. Hydrograph is the graphical representation of:

37 / 50

37. Rails are fixed on steel sleepers:

38 / 50

38. The slope provided to the road surface in the traverse direction to drain off rain water is best termed as:

39 / 50

39. In WBM roads the binding medium is………..

40 / 50

40. The rate of rise or fall the road surface along its length, is called

41 / 50

41. In bitumen bound macadam roads a bituminous premix at the following is temperature is applied:

42 / 50

42. The surface area for both sided of painting of fully glazed window is estimated as ‘one side window surface’ multiplied by:

43 / 50

43. While analyzing the rates, generally the contractor’s profit and overhead is added at the rate of:

44 / 50

44. The method of valuation of a building as used by commercial banks, is based on:

45 / 50

45. The estimated time required to perform an activity, is known as:

46 / 50

46. The amount of money paid to the contractor by the client after the agreement and before the execution of work is known as:

47 / 50

47. Site order book is used for recording:

48 / 50

48. The height of the pilot’s eye above the runway surface is assumed:

49 / 50

49. For night landing, the thresholds are lighted:

50 / 50

50. The final operation of finishing floors, is known as

Your score is

The average score is 61%

0%

Exit

Show CommentsClose Comments

Leave a comment