Sub-Engineer Mock Test of 50 Past Question #41

Sub-Engineer Collection of 50 Past Question from Loksewa Aayog Mock Test.

1 / 50

1. The theodolite is an instrument used for measuring very accurately:

2 / 50

2. The operation of turning the table so that all the lines on the paper are parallel to the corresponding lines on the ground is called:

3 / 50

3. The method of plane tabling commonly used for establishing the instrument station only is a:

4 / 50

4. When several contours coincide, it indicates a:

5 / 50

5. A curve of varying radius is known as:

6 / 50

6. The rocks formed by deposition are called:

7 / 50

7. The quality of cement is good if it has more of:

8 / 50

8. When a bitumen is graded 75/15, the figure 75 represents:

9 / 50

9. The function of a paints is:

10 / 50

10. The ratio of the largest load in a test to the original cross- sectional area of the test:

11 / 50

11. The bending moment at a section tends to bend or deflect the beam and the internal stresses resist its bending, The resistance offered by the internal stresses to the bending, is called:

12 / 50

12. If a rod is simultaneously pulled at both of its ends, it will be a case of:

13 / 50

13. The specific gravity of water is taken as:

14 / 50

14. The total energy of a liquid in motion is equal to:

15 / 50

15. The discharge over a rectangular notch is:

16 / 50

16. If fluid or flow parameters at any given instant remain same at every point in space, it is called:

17 / 50

17. Talus is the soil transported by:

18 / 50

18. Most of the shear tests are done in equipment which are:

19 / 50

19. Stability of slopes can be increased by:

20 / 50

20. The angle between the horizontal and the slope of heap produced by pearling clean dry sand from a small height is known as:

21 / 50

21. Combined footing is generally used when :

22 / 50

22. A grillage foundation is used under:

23 / 50

23. The property of fresh concrete, in which the water in the mix tends to rise to the surface while placing and compaction is known as:

24 / 50

24. A reinforced concrete beam will crack if tensile stressed up in the concrete below the neutral axis is:

25 / 50

25. The moment of resistance of an under reinforced section is computed on the basis of:

26 / 50

26. In a beam section if the steel reinforcement is of such a magnitude that the permissible stresses in concrete and steel are developed simultaneously, the section is known as:

27 / 50

27. A temporary rigid structure having platforms raised up as the building increases in height, is called:

28 / 50

28. The vertical member which support the door frame are called:

29 / 50

29. A wall built to resist the pressure of earth filling is known as:

30 / 50

30. In made up ground having a low value of its bearing power, heavy concentrated structural loads are generally supported by providing:

31 / 50

31. The filling in cavities with cement slurry is known as:

32 / 50

32. A sanitary sewer is expected to run:

33 / 50

33. Harmful bacteria are called:

34 / 50

34. Water for domestic consumption should be :

35 / 50

35. What will be the daily per capita water demand for acuity of 0.2 million people and whose total water requirement are per annum is 19710000 cube meter?

36 / 50

36. The moisture content of the soil, after free drainage has removed most of the gravity water, is known as:

37 / 50

37. The ratio between the area of a crop irrigated and the quantity of water required during its entire period of the growth is known as:

38 / 50

38. A solid construction put across the river to raise its water level and divert the water into the canal, is known as:

39 / 50

39. What is the purpose of providing transition curves in road construction work?

40 / 50

40. A road is aligned in a ruling gradient of 1:20 How much height is gained in a length of 10km?

41 / 50

41. When pavement or track is sloped upwards towards the outside of a curve, it is said to be :

42 / 50

42. In full grouted method of construction of bituminous roads, rolling is done with:

43 / 50

43. Drain constructed on the up hill side to prevent hill catchment area water coming to the road is known as:

44 / 50

44. Specification of works are prepared to :

45 / 50

45. Bill of quantities is prepared based on:

46 / 50

46. The quantity of brickwork quarried for a building is 10000 cft. If the size of a brick 9″x41/2×21/2″ calculate the number of bricks required:

47 / 50

47. Construction schedule is prepared after collecting

48 / 50

48. Line of the balance techniques used for

49 / 50

49. A major beam in a building structure, is known as

50 / 50

50. When a load is transferred through one surface to another surface in contact, the stress is known as