Highway Engineering Chapter Wise McQ Test of 25 Question #8

Highway Engineering Chapter Wise McQ Test of 25 Question for PSC, NEC, UPSC, SSC and Many more.

1 / 25

1. When flow of water is temporary and small, then suitable cross drainage structure is

2 / 25

2. Water flows above road in case of

3 / 25

3. Mostly used cross drainage structure in road is

4 / 25

4. If the level of bridge is below the ground level, then it is

5 / 25

5. Span of bridge is more than

6 / 25

6. According to Nepal Bridge Standard 2067, span of minor bridge is

7 / 25

7. The bridge having total length greater than 50 m is

8 / 25

8. Steel truss bridge having span more than 100 m is

9 / 25

9. Arch bridge is

10 / 25

10. Type of bridge is according to material used in construction is

11 / 25

11. Length of Karnali bridge situated in Mahendra Highway (HO1) is

12 / 25

12. Length of Karnali bridge situated in Mahendra Highway (HO1) is

13 / 25

13. Trail bridge is used by

14 / 25

14. Span of long span trail bridge is

15 / 25

15. In suspension bridge, load is taken by

16 / 25

16. Work done at last on construction of trail bridge is

17 / 25

17. Setting out of trail bridge includes

18 / 25

18. Width of roadway over bridge shall not be less than ……. for single lane road

19 / 25

19. Minimum carriage way width on bridge on highway is

20 / 25

20. Width of foot way over bridge shall not be less than

21 / 25

21. Height of raised curbs shall not be less than

22 / 25

22. Height of safety bridge curbs shall not be less than

23 / 25

23. Minimum height of railing over foot way of bridge is

24 / 25

24. Minimum free board required for bridge is

25 / 25

25. Minimum vertical distance between road level and over bridge is