65 Estimating & Costing Chapter Wise McQ Test of 25 Question #8 Estimating & Costing Chapter Wise McQ Test of 25 Question for PSC, NEC, UPSC, SSC and Many more. 1 / 25 1. The valuable properties found during excavation, it becomes property of A. contractor B. labors C. owner of site D. government 2 / 25 2. Impurities on sand should be A. less than 5% by volume of sand B. less than 5% by weight of sand C. less than 10% by volume of sand D. less than 10% by weight of sand 3 / 25 3. Stone used in masonry, should not absorb water A. more than 5% by volume of it. B. more than 5% by weight of it. C. more than 10% by volume of it D. more than 10% by weight of it 4 / 25 4. Formwork should be A. strong enough to carry load of casting structure B. non water absorbent C. well seasoned and light weight D. all of the above 5 / 25 5. Wooden formwork can be reused A. 5 times B. 10 times C. 25 times D. 50 times 6 / 25 6. No. of holdfast and hinge in door is A. 2 B. 4 C. 6 D. 8 7 / 25 7. The concealed faces of the frames of doors and windows are painted with A. two coats of primer B. two coats of same enamel paint which is applied for the rest of the frame C. varnish D. two coats of coaltar 8 / 25 8. AC stands for A. Aluminum Cement B. Asbestos Coil C. Asbestos cement D. Assistant Cement 9 / 25 9. Side lap provided in GI sheet is A. 1 corrugation B. 2 corrugation C. 3 corrugation D. 4 corrugation 10 / 25 10. In a galvanised corrugated iron sheet the pitch (centre to centre distance) of corrugation is usually A. 50 mm B. 100 mm C. 75 mm D. 150 mm 11 / 25 11. The number of corrugations per sheet in case of Asbestos cement corrugated sheet is A. 3 B. 5 C. 7 D. 10 12 / 25 12. The standard width of a CGI sheet is A. 32" B. 36" C. 40" D. 45" 13 / 25 13. The standard width of asbestos cement corrugated sheet is A. 0.9 m B. 1.0 m C. 1.05 m D. 1.25 m 14 / 25 14. In CGI sheet roofing, the overlap along the length of sheet should not be less than A. One corrugation B. One and half corrugation C. Two corrugation D. None of above 15 / 25 15. The thickness of 25 gauge sheet is A. Less than 1 mm B. 1 mm C. Between 1 mm and 1.5 mm D. 2 mm 16 / 25 16. Whenever colour washing on AC corrugated sheets is done, in the estimation the plan area of the sheets is increased by A. 5% B. 10% C. 15% D. 20% 17 / 25 17. To account for corrugation, the plain area of the semi-corrugated asbestos sheet is increased by (for white washing) A. 1% B. 10% C. 20% D. 30% 18 / 25 18. Painting area of semi-corrugated sheet is A. Painting area = 1.10 * plan area B. Painting area = 1.20 * plan area C. Painting area = 1.30 * plan area D. Painting area = 1.50 * plan area 19 / 25 19. Technique of finding the fair price of an existing building or property is known as A. Estimation B. Valuation C. Pricing D. costing 20 / 25 20. _______ is the technique of estimating or determining the fair price or value of a property such as a building, a factory, other engineering structures of various types. A. Depreciation B. capital value C. valuation D. taxation 21 / 25 21. Finding present value of any structure/property based on reality is known as A. estimating B. valuation C. surveying D. pricing 22 / 25 22. Value of any property depends on A. life of property B. location of property C. bank interest D. all of the above 23 / 25 23. Purpose of valuation is A. to sell or buy property B. to take loan by mortgaging property C. for taxation purpose D. all of the above 24 / 25 24. Generally, rent of building is A. 0-5 % of valuated cost B. 5-10 % of valuated cost C. 10-15 % of valuated cost D. 15-20 % of valuated cost 25 / 25 25. The valuation of property is done when A. owner of property wants to sell it B. municipal tax, wealth tax, estate duty etc. have to be fixed C. insurance of the property has to be done D. all of the above Your score is The average score is 54% 0% Restart quiz Exit civil engineerEstimating & Costingmcq civilnecpscupsc