1 / 25

1. Which of the following does not represent an activity?

2 / 25

2. In resources levelling

3 / 25

3. Sensitivity analysis is a study of

4 / 25

4. Preliminary project report for a road project must contain

5 / 25

5. For which of the following materials, the output of power shovels for a fixed shovel size will be maximum

6 / 25

6. If the output of a dragline for 90° angle of swing at optimum depth of cut is X, then the output for
120° angle of swing at 120 % of optimum depth of cut will be

7 / 25

7. In PERT analysis, the time estimates of activities and probability of their occurrence follow

8 / 25

8. Grader is used mainly for

9 / 25

9. Which of the following surfaces will give highest rolling resistance for a rubber tyred vehicle?

10 / 25

10. Which of the following earth moving machines has the shortest cycle time?

11 / 25

11. Updating may result in

12 / 25

12. The time by which a particular activity can be delayed without affecting the preceding and succeeding activities is known as

13 / 25

13. During the construction period, price variation clause in contracts caters to

14 / 25

14. Critical path method

15 / 25

15. At a work site, statistical quality control of concrete means

16 / 25

16. A critical ratio scheduling

17 / 25

17. For a given activity, the optimistic time, pessimistic time and the most probable estimates are 5, 17 and 8 days respectively, The expected time is

18 / 25

18. Pick up the correct statement from the following:

19 / 25

19. In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having

20 / 25

20. A golden rule for the procurement of construction stones, suggests

21 / 25

21. The time with which direct cost does not reduce with the increase in time is known as

22 / 25

22. Interfering float is the difference between

23 / 25

23. While filling the tender for any work, the contractor considers

24 / 25

24. If the expected time of completion of a project is 60 weeks with a standard deviation of 5 weeks, the probability of completing the project in 50 weeks and 65 weeks respectively will be

25 / 25

25. Power stations are generally treated as