31

Mcq for Civil Engineering Sub engineer Mock Test of 25 Past Question #12

Sub-Engineer Collection of 25 Past Question from Loksewa Aayog Mock Test.

1 / 25

1. Rapid curing cutback is produced by blending bitumen with

2 / 25

2. Bitumen grade 80/100 means

3 / 25

3. Maximum size of clay particle is

4 / 25

4. Soil is considered as three phase system because it contains

5 / 25

5. Concrete face is painted with

6 / 25

6. A foundation is called shallow, if its depth is

7 / 25

7. The function of base of an oil paint is

8 / 25

8. The vertical faces of a door opening which support frame of the door are

9 / 25

9. The width formation of a road means the width of……….

10 / 25

10. In specification of earth work in foundation trenches, specified lead is…………..

11 / 25

11. The fundamental principle of surveying is to work from the…………

12 / 25

12. A cantilever beam is one which is

13 / 25

13. A beam is said to be loaded is pure bending when………….

14 / 25

14. Height of chimney of kiln is generally

15 / 25

15. Water in open channel is measured through

16 / 25

16. In water bound macadam roads, binding material, is

17 / 25

17. Which of following contract is suitable to control the tendency of the contractor to increase the cost of the project unnecessarily

18 / 25

18. The building design may be influenced by

19 / 25

19. The service area in a building means the area occupied by

20 / 25

20. The commonly used raw in manufacture of cement is

21 / 25

21. Weirs are normally used to calculate:

22 / 25

22. The canal which is not supposed to do any irrigation is called:

23 / 25

23. Chainage is the distance

24 / 25

24. The under surface of an arch, is called

25 / 25

25. The minimum superelevation in rolling terrain in plains, is limited to

Your score is

The average score is 60%

0%

Exit

Show CommentsClose Comments

Leave a comment