393

Sub-Engineer Mock Test of 50 Past Question #94

Sub-Engineer Collection of 50 Past Question from Loksewa Aayog Mock Test.

1 / 50

1. What is the R.F. for scale 1cm= 5m?

2 / 50

2. The scale to measure three dimensions is called:

3 / 50

3. Total station measures:

4 / 50

4. The choice scale of the map for plotting survey data depends on:

5 / 50

5. In stone masonry, stones are so placed that the direction of pressure to the plane of bedding is:

6 / 50

6. Maximum percentage of_____ is available in cement

7 / 50

7. The solvent used in cutback bitumen is:

8 / 50

8. A badly mixed cement concrete results in:

9 / 50

9. The rock generally used for roofing is

10 / 50

10. Rocks formed due to alteration of original structure due to heat and excessive pressure are called:

11 / 50

11. The projection of any feature on the horizontal plane is called:

12 / 50

12. Dimension lines and projection line in the drawing are shown by:

13 / 50

13. What is the dimension of standard A3 size paper?

14 / 50

14. Drawings used in construction site are known as:

15 / 50

15. As build drawings are prepared:

16 / 50

16. Maximum size of clay particle is:

17 / 50

17. The ratio of volume of voids to total volume of given soil is:

18 / 50

18. The property of soil which permits water to percolate through it is known as:

19 / 50

19. Bearing capacity of soils depends upon …….. of particles:

20 / 50

20. Piles which support the load by skin friction are known as:

21 / 50

21. Lintel is designed for bending monent of ……… where w=total load?

22 / 50

22. In public building the width of the steps may be kept between:

23 / 50

23. The setting time of cement can be increased by the addition of:

24 / 50

24. Full form of T.E.L?

25 / 50

25. Man hole in sewer line is used for,

26 / 50

26. What is the design discharge for intake structures?

27 / 50

27. Which of the following is not an irrigation method?

28 / 50

28. Canal losses are:

29 / 50

29. Base period of crop generally given in:

30 / 50

30. When a canal passes below a drain with normally pipe flow, the structure is known as

31 / 50

31. In water bound macadam road, the binding material is:

32 / 50

32. According to NRS, the width of single lane road is:

33 / 50

33. The right of way of national highway in Nepal is:

34 / 50

34. The type of curves generally provided on highway is:

35 / 50

35. The is ………..constructed only on the hill side of the road.

36 / 50

36. The maximum design speed for hairpin bends in hill road taken as:

37 / 50

37. Bridge, whose center line is not at right angle to the stream flow is called:

38 / 50

38. In bitumen bound in macadam roads a bituminous premix at the following temperature is applied:

39 / 50

39. The unit of measurement for concrete work in R.C.C. is:

40 / 50

40. In long and short wall estimation, the length of long wall is the centre to centre distance between the walls and:

41 / 50

41. The most reliable estimate is:

42 / 50

42. The scrap value of wood after using six times in form work for rate analysis purpose is normally taken as:

43 / 50

43. The cross-sections for a highway is taken at:

44 / 50

44. The unit of measurement is per tonne for

45 / 50

45. Specification of a holdfast is given in terms of

46 / 50

46. Quantity of 5m long, 30 cm width and 4 m high wall is:

47 / 50

47. The maximum amount of mobilization paid to the contractor shall not treat

48 / 50

48. The method of directly hiring the labours (skilled & unskilled) in a construction work by an agency is known as

49 / 50

49. What is the difference between quotation and direct order?

50 / 50

50. During seepage through an earth mass, the direction of seepage is

Your score is

The average score is 69%

0%

Exit

Show CommentsClose Comments

Leave a comment