187

Sub-Engineer Mock Test of 50 Past Question #25

Sub-Engineer Collection of 50 Past Question from Loksewa Aayog Mock Test.

1 / 50

1. In direct methods of contouring, the process of locating or identifying points
laying on a contour is called

2 / 50

2. Substance bar is an instrument used for

3 / 50

3. The real image of an objects formed by the objectives must lie

4 / 50

4. How many chains are used in surveying

5 / 50

5. Due to attack of dry rot, the timber

6 / 50

6. Which one of the following cements contains maximum percentage of di-calcium
silicates

7 / 50

7. The stone suitable for rubble masonry should be

8 / 50

8. Which of the following pairs give a correct combination of the useful and harmful
constituents respectively of a good brick earth

9 / 50

9. Which of the following end conditions permits the displacement in any direction
and also rotation ?

10 / 50

10. When the cantilever beam is loaded at its free end, the maximum compressive
strength shall developed at

11 / 50

11. When the cantilever beam is loaded at its free end, the maximum Tensile
strength shall developed at

12 / 50

12. Which of the following section is the most efficient in carrying bending moments ?

13 / 50

13. The property of fluid by virtue of which it offers resistance to shear is called

14 / 50

14. Eulers dimensionless number related the following

15 / 50

15. Hot wire anemometer is used to measures

16 / 50

16. A grillage foundation

17 / 50

17. Coefficient of permeability of soil

18 / 50

18. Shear strength of a soil is unique function of

19 / 50

19. Minimum size of particle of soil silt, is

20 / 50

20. Steel is effectively used in

21 / 50

21. The maximum are of tension reinforcement in beams shall not exceeds

22 / 50

22. The minimum number of main steel bars provided in R.C.C

23 / 50

23. The diameter of longitudinal bars of column should never be less than

24 / 50

24. Curing of pavements, floors, roofs and slab is done by

25 / 50

25. The foundation are placed below ground level, to increasing

26 / 50

26. Workability is tested by

27 / 50

27. Water cement ratio is generally expressed in volume of water required per

28 / 50

28. If pH value of water is

29 / 50

29. In distribution pipes, drain valves are provided at

30 / 50

30. The population growth curve is

31 / 50

31. Water supply system includes

32 / 50

32. Irrigation canal are generally aligned along

33 / 50

33. In a canal syphon, the flow is

34 / 50

34. The duty is largest

35 / 50

35. Lining of canal ……. the maintenance of the canal

36 / 50

36. In highway construction, rolling start from

37 / 50

37. The drain which is provided parallel to road way intercept and divert the water
from hill slope is known as

38 / 50

38. The usual width of parapet wall along highway in hilly region is

39 / 50

39. The order of booking dimension is

40 / 50

40. The Brick wrok is measured in sq meter, in case of

41 / 50

41. Brick wall are measured in sq meter if the thickness of the wall is

42 / 50

42. While preparing a detailed estimate

43 / 50

43. For D.P.C at plinth level, the mostly adopted materials is

44 / 50

44. Which one of the following represents the activity

45 / 50

45. Mile stone chart were invented in the year of

46 / 50

46. The most popular type of organization used in civil engineering construction

47 / 50

47. The runway orientation is made so that landing and take off are

48 / 50

48. Airport elevation is the reduced level above M.S.L

49 / 50

49. The curvature of the earth is taken into consideration if the limit of survey is

50 / 50

50. The cement sand mortar preferred in load bearing wall is

Your score is

The average score is 61%

0%

Exit

Show CommentsClose Comments

Leave a comment