186 Sub-Engineer Mock Test of 50 Past Question #16 Sub-Engineer Collection of 50 Past Question from Loksewa Aayog Mock Test. 1 / 50 1. In Plane surveying A. The curvature of the earth is taken into consideration B. the surveys extend over small areas C. the surveys extend over large areas D. all of the above 2 / 50 2. The difference between the sum of the angles of a spherical triangle on the earth’s surface and the angles of the corresponding plane triangle for every 195.5 km2 of area is only A. 1 second B. 5 second C. 10 second D. 15 second 3 / 50 3. In order to determine the natural features such as valleys, rivers, lakes etc., the surveying preferred is A. City Survey B. Topographical Survey C. Plane survey D. Hydrological survey 4 / 50 4. A base line in a chain survey A. checks the accuracy of the framework B. enables the surveyor to locate the interior details which are far away from the main chain lines C. fixes up the directions of all other lines D. all of the above 5 / 50 5. Turpentine oil is used in paints as a A. base B. thinner C. drier D. vehicle 6 / 50 6. In order to dry the quarry sap of a freshly quarried stone, it should be exposed to open air for a period of A. One months B. Three months C. 6 to 12 months D. 24 months 7 / 50 7. The maximum percentage of water absorption of 1st class brick in 24 hrs should be limited to A. 10 % B. 15 % C. 20 % D. 24 % 8 / 50 8. Laterite is chemically classified as A. caleareous rock B. argillaceous rock C. sillcious rock D. metamorphic rock 9 / 50 9. Orthographic projection means A. 90 degree B. 45 degree C. 30 degree D. All of the above 10 / 50 10. In case of orthographic projection the number of view generally used are A. 2 B. 4 C. 6 D. 8 11 / 50 11. Which line type is thin and light ? A. visible line B. construction line C. center line D. all of the above 12 / 50 12. Free hand sketch is normally used for A. concept B. final C. Discussion D. None of the above 13 / 50 13. When the plastic limit of a soil is greater than the liquid limit, then the plasticity index is reported as A. negative B. zero C. non-plastic (NP) D. 1 14 / 50 14. Find the R.F for scale 1 cm = 10 m A. 1/10 B. 1/100 C. 1/1000 D. 1/10000 15 / 50 15. The force per unit length is the unit of A. Surface Tension B. Force C. Viscosity D. Capillarity 16 / 50 16. One litre of water occupies a volume of A. 100 cm3 B. 250 cm3 C. 500 cm3 D. 1000 cm3 17 / 50 17. The soil transported by wind is called A. aeolian soil B. marine soil C. alluvial soil D. all of the above 18 / 50 18. A pycnometer is used to determine A. specific gravity and dry density B. water content and void ratio C. water content and specific gravity D. dry density and void ratio 19 / 50 19. particle size range is measured by A. effective size B. uniformity coefficient C. coefficient of curvature D. none of the above 20 / 50 20. The ratio of the volume of voids to the total volume of soil mass is called A. Void ratio B. Porosity C. water content D. Air content 21 / 50 21. Ratio of cement, sand and aggregate for M25, is A. 1:1:2 B. 1:1.5:3 C. 1:2:4 D. 1:3:6 22 / 50 22. Minimum percentage of steel in column, is A. 0.40 % B. 0.6 % C. 0.8% D. 1 % 23 / 50 23. Effective length of column, if both ends are fixed, is A. L B. 0.5L C. 2L D. 0.713L 24 / 50 24. The cover provided in the column having size greater than 200 mm x 200 mm A. 15 mm B. 20 mm C. 25 mm D. 40 mm 25 / 50 25. In vertical D.P.C. ,thickness of cement concrete is A. 2 cm B. 4 cm C. 6 cm D. 8 cm 26 / 50 26. Expansion joins in masonry walls are provided if length exceeds A. 10 m B. 20 m C. 40 m D. 45 m 27 / 50 27. Minimum width of staircase for residential buildings, A. 70 cm B. 80 cm C. 100 cm D. 110 cm 28 / 50 28. In horizontal D.P.C. ,thickness of cement concrete is A. 2 cm B. 4 cm C. 6 cm D. 8 cm 29 / 50 29. Design period for rural water supply system, is A. 10 years B. 15 years C. 20 years D. 25 years 30 / 50 30. Percentage of population which have access to safe water supply A. 80 % B. 85 % C. 90 % D. 75 % 31 / 50 31. Two sewer section laid at same grade, will be hydraulically equivalent, if A. Their discharge capacity when running full are equal B. Their flow velocity when running full are equal C. Their flowing area running full are equal D. All the above factors are equal 32 / 50 32. Minimum size of manhole, is A. 30 cm B. 45 cm C. 60 cm D. 80 cm 33 / 50 33. The weight of 12 mm diameter mild steel rod per meter length is equal to A. 0.62 kg B. 0.88 kg C. 0.40 kg D. 0.22 kg 34 / 50 34. Yellow colour of light singles means A. ready to go B. go C. stop D. none 35 / 50 35. The quantity of liquid flowing per second through a pipe is termed as A. discharge B. pressure head C. head D. pipe line 36 / 50 36. A contour canal A. is most suitable in hilly areas B. irrigates only on one sides C. is aligned parallel to the contour of the country D. all of the above 37 / 50 37. Wall built up a cross the full width of river to rise water level is called A. orifice B. notch C. weir D. none of the above 38 / 50 38. For the transportation purpose in Nepal, the first preference is given to A. airlines B. roads C. shipping D. railways 39 / 50 39. The value of maximum allowable super elevation is A. 1:15 B. 1:20 C. 1:30 D. 1:35 40 / 50 40. Horizontal distance between the centroids of the section of cutting and feeling is called A. lead B. lift C. interval D. none of the above 41 / 50 41. For electric wiring such as fan, light, plug etc, the estimate is made in terms of A. type of point B. number of points C. total load in main kw D. total length of wiring in meters 42 / 50 42. The volume of course aggregate required to make 100 m3 of 1:2:4 concrete is A. 84 m3 B. 87 m3 C. 90 m3 D. 93 m3 43 / 50 43. The rate of payment is made for 100 cu m (per % cu m) in case of A. Earth work in excavation B. Rock cutting C. Excavation in trenches for foundation D. All of the above 44 / 50 44. Due to change in price level , a revised estimate is prepared if the sanctioned exceeds A. 2.0 % B. 2.5 % C. 4.0 % D. 5 % 45 / 50 45. A legal agreement between contractor and owner is called A. Pieces of agreement B. contract C. work order D. all of the above 46 / 50 46. Two or more companies take up the job or work in case of A. Large contract B. Multinational contract C. joint venture D. None of the above 47 / 50 47. Density of steel is …… lbs per cft A. 250 B. 450 C. 480 D. 490 48 / 50 48. Main source of water for irrigation is, A. rain falls B. canal C. sewers D. water tank 49 / 50 49. Primary air pollution is A. smoke B. sewage C. sullage D. bacteria 50 / 50 50. Ratio of concrete used in D.P.C ( Damp Proof Course) is A. 1:2:4 B. 1:4:8 C. 1:3:6 D. 1:1.5:3 Your score is The average score is 69% 0% Restart quiz Exit loksewamcqmcq civilmcqcivilmock testpscsub engineersub engineer mock test