230

Sub-Engineer Mock Test of 50 Past Question #14

Sub-Engineer Collection of 50 Past Question from Loksewa Aayog Mock Test.

1 / 50

1. The principle of super position is valid only and only if the material, is

2 / 50

2. In a truss, the joints are considered to be

3 / 50

3. At free end of cantilever beam

4 / 50

4. In a cantilever beam, a moment M is applied at the free end yields slope at free end

5 / 50

5. Ratio of cement, sand and aggregate for M25, is

6 / 50

6. Spacing of shear stirrup is

7 / 50

7. Minimum lap for compression bars, is

8 / 50

8. Minimum percentage of steel in column, is

9 / 50

9. The main principle of survey is to work

10 / 50

10. The short offset is measured with

11 / 50

11. The angle between two plane mirrors of optical square

12 / 50

12. Accidental or compensating errors of length L are proportional to

13 / 50

13. Inner part of timber log surrounding the pitch, is called

14 / 50

14. The base material for distemper, is

15 / 50

15. According to ISI, bitumen is classified into

16 / 50

16. Maximum size of clay particle is

17 / 50

17. The ratio of the volume of voids to volume of solids in soil mass, is known as

18 / 50

18. A pycnometer is used to measure

19 / 50

19. During the seepage trough soil, direction of seepage is always

20 / 50

20. Design speed for class I road in plain terrain, is

21 / 50

21. The minimum shoulder width for road class II is

22 / 50

22. According to Nepal Road Standard 2070, the Right of way for feeder road is

23 / 50

23. Most suitable material for highway embankment is

24 / 50

24. The ductility value of bitumen for suitability in road construction should not be less than

25 / 50

25. The absolute minimum radius of horizontal curve for a design speed 60Km/hr is

26 / 50

26. In water bound macadam roads, binding material, is

27 / 50

27. The height of the Pilots eyes above the runway surface is assumed

28 / 50

28. The technique of finding the exact price of existing building or property is known as

29 / 50

29. The running bill is also known as

30 / 50

30. The unit of measurement of cornice is

31 / 50

31. The information which cannot be included in drawings is conveyed to estimator through

32 / 50

32. The first stages of construction project is

33 / 50

33. Site order book is for recording

34 / 50

34. The performance security of contractor is refunded after

35 / 50

35. Which is responsible for accident occurred at worksite

36 / 50

36. To measure very low pressure we, use

37 / 50

37. The upper surface of the weir over which water flows is known as

38 / 50

38. Falling drops of water becomes sphere due to

39 / 50

39. Cavitation is caused by

40 / 50

40. The ratios of volume of air voids to the volume of total voids is

41 / 50

41. A flow net may be utilized for the determination of

42 / 50

42. Accurate determination of water content, is made by

43 / 50

43. The bearing capacity of a soil depends upon

44 / 50

44. B.O.D. of treated water should be

45 / 50

45. The depth of rice root zone is

46 / 50

46. A river training work is generally required when the river is

47 / 50

47. The ultimate nearing capacity of soil, is

48 / 50

48. Minimum no. of pile require to support a column, is

49 / 50

49. The specific gravity of sand is approximately

50 / 50

50. Horizontal flow of water in soil is due to

Your score is

The average score is 67%

0%

Exit

Show CommentsClose Comments

Leave a comment