78 Estimating & Costing McQ Online Test Chapter Wise McQ Test of 25 Question #12 Estimating & Costing Chapter Wise McQ Test of 25 Question for PSC, NEC, UPSC, SSC and Many more. 1 / 25 1. The rate of payment is made for 100 cu m (per % cu m) in case of A. Earth work in excavation B. Rock cutting C. Excavation in trenches for foundation D. All the above 2 / 25 2. The rate of an item of work depends on A. Specifications of works B. Specifications of materials C. Proportion of mortar D. All the above 3 / 25 3. The main factor to be considered while preparing a detailed estimate, is A. Quantity of the materials B. Availability of materials C. Transportation of materials D. All the above 4 / 25 4. A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is A. 500 m³ B. 1000 m³ C. 1500 m³ D. 2000 m³ 5 / 25 5. Brick walls are measured in sq. m if the thickness of the wall is A. 10 cm B. 15 cm C. 20 cm D. None of these 6 / 25 6. The plinth area of a building not includes A. Area of the walls at the floor level B. Internal shaft for sanitary installations up to 2 sq m. in area C. Lift and wall including landing D. Area of cantilevered porch 7 / 25 7. If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by A. Mid-section formula B. Trapezoidal formula C. Prismoidal formula D. All of the above 8 / 25 8. While estimating the qualities for the construction of a building, the correct metric unit is A. Metre for length B. Litre for capacity C. Cubic metre for area D. Square metres for volume 9 / 25 9. The brick work is not measured in cu m in case of A. One or more than one brick wall B. Brick work in arches C. Half brick wall D. Reinforced brick work 10 / 25 10. The cross-sections for a highway is taken at A. Right angle to the centre line B. 30 metres apart C. Intermediate points having abrupt change in gradient D. All the above 11 / 25 11. According to Indian Standards Institute, the actual size of modular bricks is A. 23 cm × 11.5 cm × 7.5 cm B. 25 cm × 13 cm × 7.5 cm C. 19 cm × 9 cm × 9 cm D. 20 cm × 10 cm × 10 cm 12 / 25 12. The following item of earth work is not measured separately. A. Setting out of works B. Site clearance C. Steps in deep excavation D. All the above 13 / 25 13. The measurement is made in square metre in case of A. Cement concrete in foundation B. R.C.C. structure C. Hollow concrete block wall D. None of these 14 / 25 14. Cost of fittings and their fixing is specified for the following sanitary fittings A. Water closets B. Flushing pipes C. Lavatory basins D. All the above 15 / 25 15. The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as A. Excavation B. Surface excavation C. Cutting D. Surface dressing 16 / 25 16. For the construction of buildings, the subheads of the estimate are A. Earthwork, Concrete work, Brick work B. Brickwork, Stone work, Roofing C. Brickwork Flooring, Wood work, Steel work D. All the above 17 / 25 17. Pick up the excavation where measurements are made in square metres for payment. A. Ordinary cuttings up to 1 m B. Surface dressing up to 15 cm depths C. Surface excavation up to 30 cm depths D. Both (b) and (c) 18 / 25 18. In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and A. Breadth of the wall B. Half breadth of wall on each side C. One fourth breadth of wall on each side D. None of these 19 / 25 19. As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken A. 1.80 litres for 5 to 10 users B. 1.20 litres for 15 users C. 1.35 for 20 users D. All the above 20 / 25 20. The expected out turn of cement concrete 1 : 2 : 4 per mason per day is A. 2.5 m³ B. 3.5 m³ C. 5.0 m³ D. 6.5 m³ 21 / 25 21. The area is measured correct to the nearest A. 0.01 sqm B. 0.02 sqm C. 0.03 sqm D. 0.04 sqm 22 / 25 22. The measurement is not made in square metres in case of A. D.P.C. (Damp proof course) B. R.C. Chhajja C. Concrete Jeffries D. Form works 23 / 25 23. The trap which is provided to disconnect the house drain from the street sewer is called A. Master trap B. Intercepting trap C. Interception manhole D. All the above 24 / 25 24. Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds A. 2.0 % B. 2.5 % C. 4.0 % D. 5.0 % 25 / 25 25. The expected out turn of 2.5 cm cement concrete floor per mansion per day A. 2.5 sqm B. 5.0 sqm C. 7.5 sqm D. 10 sqm Your score is The average score is 57% 0% Restart quiz Exit civil engineerEstimating & Costingmcqcivilmock testnecupsc