Estimating & Costing McQ Online Test Chapter Wise McQ Test of 25 Question #12

Estimating & Costing Chapter Wise McQ Test of 25 Question for PSC, NEC, UPSC, SSC and Many more.

1 / 25

1. The rate of payment is made for 100 cu m (per % cu m) in case of

2 / 25

2. The rate of an item of work depends on

3 / 25

3. The main factor to be considered while preparing a detailed estimate, is

4 / 25

4. A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is

5 / 25

5. Brick walls are measured in sq. m if the thickness of the wall is

6 / 25

6. The plinth area of a building not includes

7 / 25

7. If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by

8 / 25

8. While estimating the qualities for the construction of a building, the correct metric unit is

9 / 25

9. The brick work is not measured in cu m in case of

10 / 25

10. The cross-sections for a highway is taken at

11 / 25

11. According to Indian Standards Institute, the actual size of modular bricks is

12 / 25

12. The following item of earth work is not measured separately.

13 / 25

13. The measurement is made in square metre in case of

14 / 25

14. Cost of fittings and their fixing is specified for the following sanitary fittings

15 / 25

15. The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as

16 / 25

16. For the construction of buildings, the subheads of the estimate are

17 / 25

17. Pick up the excavation where measurements are made in square metres for payment.

18 / 25

18. In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and

19 / 25

19. As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken

20 / 25

20. The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

21 / 25

21. The area is measured correct to the nearest

22 / 25

22. The measurement is not made in square metres in case of

23 / 25

23. The trap which is provided to disconnect the house drain from the street sewer is called

24 / 25

24. Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds

25 / 25

25. The expected out turn of 2.5 cm cement concrete floor per mansion per day