139 Estimating & Costing Chapter Wise McQ Test of 25 Question #11 Estimating & Costing Chapter Wise McQ Test of 25 Question for PSC, NEC, UPSC, SSC and Many more. 1 / 25 1. Which of the following is useful area of building for living purpose? A. Plinth area B. Floor area C. Circulation area D. Carpet area 2 / 25 2. The useful part of livable area of a building is known as A. carpet area B. circulation area C. horizontal circulation area D. plinth area 3 / 25 3. Carpet area does not include A. verandah, corridor and passage B. bathroom and laboratory C. kitchen and pantry D. all of the above 4 / 25 4. Carpet area does not include the area of A. the walls along with doors and other openings B. verandah, corridor and passage C. bath room and lavatory D. All of the above 5 / 25 5. Which is largest area in following areas of building? A. Plinth area B. Floor area C. Carpet area D. Wall area 6 / 25 6. The plan of a building is in the form of a rectangle with centre line dimension of outer wall is 9.7m*14.7m. Thickness of wall in superstructure is 0.30 m. Then its plinth area is A. 67 B. 72 C. 78 D. 84 7 / 25 7. The plan of a building is in the form of a rectangle with centre line dimension of outer wall is 9.7m*14.7m. Thickness of wall in superstructure is 0.30 m. Then its plinth area is A. 150 m² B. 145 m² C. 145.5 m² D. 135.36 m² 8 / 25 8. The covered area of a proposed building is 150m². It includes a rear courtyard of 5m*4m. If theprevailing plinth area rate for similar building is Rs. 1250/m². What is its cost. A. 187500 B. 212500 C. 162500 D. 3750000 9 / 25 9. The preliminary or approximate estimate is prepared based on the A. plinth area rate B. cost of similar work C. detailed rate analysis D. labour rate 10 / 25 10. Which of the following is very rough estimate? A. Preliminary estimate B. Detailed estimate C. Plinth area estimate D. Revised estimate 11 / 25 11. Preliminary estimate is prepared on the basis of A. district rate B. plinth area of building C. government norms D. cost of similar work 12 / 25 12. What is required for preliminary studies of various aspects of a work or project? A. revised estimate B. abstract estimate C. plinth area estimate D. supplementary estimate 13 / 25 13. Approximate cost of a hostel building for 100 students @Rs.10000/- per student works out as A. Rs. 1 lakhs B. Rs. 10 lakhs C. Rs. 100 lakhs D. Rs. 1000 lakhs 14 / 25 14. Per kilometre basis depending on the nature of road, for 10 km of a state highway approx. cost @ Rs. 50000/- per 1 km works out as A. Rs. 5 lakh B. Rs. 50 lakh C. Rs. 1 lakh D. Rs. 10 lakh 15 / 25 15. Estimate expected to be least accurate is A. Supplementary estimate B. Plinth area estimate C. Detailed estimate D. Revised estimate 16 / 25 16. _________ is prepared on the basis of plinth area of building, the rate being deducted from the cost of similar building having similar specification, heights and construction, in the locality. A. Cube Rate Estimate B. Supplementary Estimate C. Maintenance Estimate D. Plinth Area Estimate 17 / 25 17. Plinth area estimate is mostly used fo A. Building B. Hydropower C. Water tank D. All of the above 18 / 25 18. The approximate cost of building cubic content (volume)of 400 cum @ rs. 180 per cum comes to be A. 72000 B. 720 C. 7200 D. 72 19 / 25 19. Which of the following is most accurate estimate? A. Preliminary estimate B. Detailed estimate C. Plinth area estimate D. Revised estimate 20 / 25 20. Estimate expected to be least accurate is A. Supplementary estimate B. Plinth area estimate C. Detailed estimate D. Revised estimate 21 / 25 21. The most reliable estimate is A. Detailed estimate B. Preliminary estimate C. Plinth area estimate D. Cube rate estimate 22 / 25 22. Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds A. 2.00% B. 2.50% C. 4.00% D. 5.00% 23 / 25 23. A revised estimate is usually prepared when the original estimate has exceeded by more than A. 1% B. 2% C. 10% D. 100% 24 / 25 24. When the original sanctioned estimate is exceeded by more than 5%, in the circumstances which estimate is required? A. Supplementary estimate B. Revised estimate C. Detailed estimate D. Annual repair estimate 25 / 25 25. When additional items are added ……………. is prepared. A. revised estimate B. supplementary estimate C. annual repair and maintenance estimate D. detail estimate Your score is The average score is 55% 0% Restart quiz Exit civil engineerEstimating & Costingloksewamcq civilnecpscupsc