Estimating & Costing Chapter Wise McQ Test of 25 Question #10

Estimating & Costing Chapter Wise McQ Test of 25 Question for PSC, NEC, UPSC, SSC and Many more.

1 / 25

1. Centre line length of wall is

2 / 25

2. Centre line method is specially adopted for estimating

3 / 25

3. The ‘centre line method’ is specially adopted for estimating the …………

4 / 25

4. While estimating building having internal walls with different thickness, the referral method of estimation is

5 / 25

5. In crossing wall method, length for inner wall is

6 / 25

6. In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and

7 / 25

7. The cross-sections for a highway is taken at

8 / 25

8. If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is

9 / 25

9. Formula for Mean Area method for finding out the quantity

10 / 25

10. If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by

11 / 25

11. In general, while computing volume of earthwork, the volume computed by the prismoidal formula will be………………..as compared to that calculated by trapezoidal formula.

12 / 25

12. The assumption on which the trapezoidal formula for volumes is based, is

13 / 25

13. Berms are provided in canals if these are

14 / 25

14. Weight of 10 mm diameter rod per meter length is

15 / 25

15. Cross sectional area of 10 mm diameter rod is

16 / 25

16. The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is

17 / 25

17. What should be the actual area of the length measuring 2.5cm * 4cm (0.025m * 0.04m) in a cadastral map drawn at a scale of 1:500?

18 / 25

18. The quantity of metal required in cubic metre for 3.7m wide road of one km long for one layer compacted thickness 8 cm is…

19 / 25

19. It is built-up covered area of a building measured by external dimension of the building at floor level is called

20 / 25

20. Plinth area includes

21 / 25

21. Pick up the item of work not included in the plinth area estimate

22 / 25

22. The plinth area of a building not includes

23 / 25

23. Staircase, lifts etc are

24 / 25

24. Floor area of verendhas, passages, corridors, stair cases etc which area used for movement of persons using the building is known as

25 / 25

25. The floor area includes the area of the balcony up to