226

Sub-Engineer 50 Past Question Mock Test #8

Sub-Engineer Collection of 50 Past Question from Loksewa Aayog Mock Test.

1 / 50

1. Built up drawing is normally constructed for the work of :

2 / 50

2. Find the R.F for scale 1 cm = 10 m

3 / 50

3. Which line type is thin and light?

4 / 50

4. The size of A3 paper is

5 / 50

5. Drawing board is made of

6 / 50

6. Which of the following represent reducing scale ?

7 / 50

7. The rate of an item of works depends on

8 / 50

8. The unit of measurement of Brick work is in

9 / 50

9. The unit of measurements of Railing is in

10 / 50

10. The weight of an item measured correct to nearest

11 / 50

11. The center line methods is specially adopted for

12 / 50

12. The necessary elements of the estimate are

13 / 50

13. Contours of different elevations may cross each other in the case of

14 / 50

14. For true difference in elevations between two points A and B, the level must be
set up

15 / 50

15. The line of collimation method of reduction of levels, does not provide check on

16 / 50

16. The chord of a curve less than peg interval, is known as

17 / 50

17. Principle of surveying is to prevent accumulations of errors is

18 / 50

18. A well conditional triangle has no angle less than

19 / 50

19. The rock formed by gradual deposition, are called

20 / 50

20. Final setting time of quick setting cement is ,

21 / 50

21. Final initial setting time of OPC cement is ,

22 / 50

22. Galvanising means covering iron with a thin coat of

23 / 50

23. Good quality stone must

24 / 50

24. The principle constituents of good brick earth is

25 / 50

25. The strengths of cement is reduced by …… after 24 months

26 / 50

26. The initial setting time of hydraulic lime, is

27 / 50

27. PVC stands for

28 / 50

28. Concrete mainly consists of

29 / 50

29. Distemper is used on

30 / 50

30. Difference in Plain Concrete and Reinforced concrete is

31 / 50

31. Workability improved by adding

32 / 50

32. The commonly used materials in the manufacture of cement is

33 / 50

33. Protecting the buildings against dampness is called

34 / 50

34. Slump test is done for

35 / 50

35. Canal used to drain of water from water logged area is

36 / 50

36. Canal taking off from a river with or without head regulator, is called

37 / 50

37. In concrete canal the approximate permissible velocity of water should not exceed

38 / 50

38. The minimum value of camber provided for thin bituminous surface hill roads, is

39 / 50

39. Camber is

40 / 50

40. For the transportation purpose in Nepal the first preference is given to

41 / 50

41. The types of curves generally provided on highway is

42 / 50

42. The volume of Fine aggregate required to make 10 m3 of 1:2:4 concrete is

43 / 50

43. The main objective of water supply is

44 / 50

44. Recommended pH value of potable water is

45 / 50

45. Water supply includes

46 / 50

46. Completion of an activity on CPM network diagram, is generally known as

47 / 50

47. A dummy activity

48 / 50

48. Main source of water for irrigation is

49 / 50

49. Primary air pollution is

50 / 50

50. Ratio of concrete used in D.P.C ( Damp Proof Course) is

Your score is

The average score is 83%

0%

Exit

Show CommentsClose Comments

Leave a comment