Mcq for Civil Engineering Sub engineer Mock Test of 50 Past Question #109

9

Mcq for Civil Engineering Sub engineer Mock Test of 50 Past Question #109

Sub-Engineer Collection of 50 Past Question from Loksewa Aayog Mock Test.

1 / 50

1. The top diameter, bottom diameter, and height of the slump mould are :

2 / 50

2. Water logging is caused due to

3 / 50

3. The total reaction time for an average driver for normal situation is

4 / 50

4. Water losses in water supply, is assumed as

5 / 50

5. Bar charts are considered suitable for

6 / 50

6. The property of a materials by which it can be beaten or rolled into plates, is
called

7 / 50

7. Which of the following materials will have the highest young modulus ?

8 / 50

8. The soil moisture driven off by heat, is called

9 / 50

9. The soil transported by running water is called

10 / 50

10. In case of cantilever beam, main bars are kept

11 / 50

11. Raft foundation are generally preferred to when the area required for individual
footing, is more than

12 / 50

12. Two sewer section laid at same grade, will be hydraulically equivalent, if

13 / 50

13. The numerical value of base period is

14 / 50

14. The volume of course aggregate required to make 100 m3 of 1:2:4 concrete is

15 / 50

15. Performance security for bidder bids 20% below estimated amount, is

16 / 50

16. Smith test of stones is performed to find out

17 / 50

17. Minimum no. of bars in circular column

18 / 50

18. Lap Splice in tension reinforcement are permitted for bars

19 / 50

19. Turbidity is mainly due to

20 / 50

20. Gantt chart indicates.

21 / 50

21. Useful soil moisture for plant growth, is

22 / 50

22. The device installed for drawing water from the source are called

23 / 50

23. Workability improved by adding

24 / 50

24. on wetting, cohesive soil

25 / 50

25. Mostly used coagulant is

26 / 50

26. The portion of road that is used pedestrians only is called

27 / 50

27. One dharni is equivalent to …….kg

28 / 50

28. Longest highway in Nepal is ………Highway

29 / 50

29. Unit weight of PCC ( Plain Cement concrete) is

30 / 50

30. The volume of course aggregate required to make 100 m3 of 1:2:4 concrete is

31 / 50

31. A scale which has a common representative fraction, but read in different measures, is called

32 / 50

32. The detention time for septic tank is in the range of

33 / 50

33. For a rectangular foundation of width b, the eccentricity of the load should not be greater
than

34 / 50

34. cement mortar mix generally used for celling plaster is

35 / 50

35. Modulus of rupture is measure of

36 / 50

36. Reinforcement provided in singly beam is to resist only

37 / 50

37. Cross slope of road (camber ) is

38 / 50

38. An average length of a pace is

39 / 50

39. Percentage of population which have access to safe water supply

40 / 50

40. Gneiss is obtained from

41 / 50

41. The small areas on painted surface enclosed by hair line cracks are called

42 / 50

42. King closer are related to

43 / 50

43. The minimum diameter of a manhole cover should be

44 / 50

44. Rate of rise or fall of the road along its alignment is

45 / 50

45. Peak form by the two rising gradient is called

46 / 50

46. The ratio of the ultimate stress to working stress is generally

47 / 50

47. The unit of measurements for scaffolding is

48 / 50

48. The maximum area of tension reinforcement in beams shall not exceed

49 / 50

49. When the cantilever beam is loaded at its free end, the maximum tensile strength
shall developed at

50 / 50

50. The shape of the bending moment diagram over the length of a beam, carrying a
uniformly distributed load is always

Your score is

The average score is 73%

0%

Exit

Leave a Comment